Photo #1 (8/13/12)
Soffit and gutter before any work
|
Photo #4 (8/13/12)
Soffit nailed over existing fascia by Alex and Franklin without
drilling ventilation holes.
(2nd crew removed soffit to reveal rotted wood had been covered.)
This is how the house was left by Alex/Franklin on 8/13.
|
![]() |
Photo #5 (8/14/12)
Gutter as cut by first crew on 8/13. Soffit finished by 2nd crew on 8/14/12.
|
![]() |
Photo #6 (8/14/12)
1. Glob of caulking between house and soffit
2. Horizontal gap between soffit edging and J-channel above
3. Edging color does not match siding color.
|
![]() |
Photo #7 (8/15/12)
When we asked why caulk would be there, Shaun immediately
tore it out and said that it shouldn't.
This is the hole that was left.
|
![]() |
Photo #8 (8/14/12)
Job as finished by 2nd crew.
|
![]() |
Photo #9 (8/19/12)
Leak after brief rain on 8/19/12.
|
Photo #10 (8/15/12)
Gutter end, rear elevation, 1st floor.
|
![]() |
Photo #11 (8/15/12)
Gutter end, front elevation, 1st floor.
|
Photo #12 (8/15/12)
Spliced gutter guard, rear elevation, 1st floor.
|
Photo #13 (8/15/12)
Spliced gutter guard, front elevation, 1st floor.
|
![]() |
Photo #14 (8/15/12)
Downspout from 2nd floor to
1st floor, rear elevation.
|
___________________________________________________
END OF PHOTOS
.









No comments: